Production
https://prod.org.br/article/doi/10.14488/1980-5411.20250133
Production
Thematic Section - Challenges in Production Economics Towards Sustainability and Digitalization

Managing uncertainty in product development and manufacturing integration: a multi-criteria, multi-phase evaluation

Daniele Gelain Rezende; Marcelo Quirino; Caio Santos Neiva; Rafael Marcuzzo; Marina Bouzon; Fernando Antônio Forcellini

Downloads: 0
Views: 47

Abstract

Paper aims: This paper aims to analyze how different sources of uncertainty interact and influence decision making across the early phases of the Product Development Process, with particular attention to their implications for manufacturing readiness and project performance.

Originality: The study advances project management and product development research by integrating a phase based perspective of uncertainty with a causal modeling approach, offering a structured understanding of how uncertainty dynamics evolve rather than treating uncertainties as isolated or static factors.

Research method: The research adopts the Decision Making Trial and Evaluation Laboratory method, supported by expert interviews, to model cause and effect relationships among eight uncertainty dimensions across the informational, conceptual, and detailed design phases of product development.

Main findings: The results indicate that technological and competitive uncertainties are the most influential factors in the informational phase, exerting strong mutual influence. In the conceptual phase, commercial uncertainty emerges as the most affected dimension, reflecting its dependence on strategic, technological, and market related factors. In the detailed phase, uncertainty intensifies, with commercial, technological, and resource uncertainties showing the highest levels of interdependence and overall importance.

Implications for theory and practice: The study contributes theoretically by demonstrating the value of a dynamic, phase sensitive view of uncertainty in product development projects. For practitioners, the findings highlight the need for adaptive, phase specific uncertainty management strategies that support better decision making, reduce late stage risks, and improve alignment between product development and manufacturing execution. These insights support more resilient projects and sustained competitive advantage.

Keywords

Uncertainty management, Product development, DEMATEL, Manufacturing integration, Project risk

References

Abanda, F. H., Jian, N., Adukpo, S., Tuhaise, V. V., & Manjia, M. B. (2025). Digital twin for product versus project lifecycles’ development in manufacturing and construction industries. Journal of Intelligent Manufacturing, 36(2), 801-831. https://doi.org/10.1007/s10845-023-02301-2.

Ali, M. A., & Rafique, Q. (2024). Strategic integration of real options for enhanced valuation and optimization in mining project planning under uncertainty: a comprehensive review. International Journal of Project Management, 6(2), 26-50. https://doi.org/10.47672/ijpm.2004.

Amajuoyi, P., Benjamin, L. B., & Adeusi, K. B. (2024). Agile methodologies: Adapting product management to rapidly changing market conditions. GSC Advanced Research and Reviews, 19(2), 249-267. https://doi.org/10.30574/gscarr.2024.19.2.0181.

Bakhshi, J., Golzad, H., Martek, I., Hosseini, M. R., & Papadonikolaki, E. (2025). Unveiling the complexity code: Navigating BIM-enabled projects with a project management complexity index. Engineering, Construction, and Architectural Management, 32(11), 7703-7732. https://doi.org/10.1108/ECAM-07-2023-0702.

Brinkmann, J. T., & Wynn, D. C. (2025). Aspects of information maturity in design and development. Research in Engineering Design, 36(2), 8. https://doi.org/10.1007/s00163-025-00450-4.

Browning, T. R., & Koch, J. (2025). Exploring the process of manufacturing change management. IEEE Transactions on Engineering Management, 72, 3599-3620. https://doi.org/10.1109/TEM.2025.3597572.

Butturi, M. A., Neri, A., Mercalli, F., & Gamberini, R. (2025). Sustainability-oriented innovation in the textile manufacturing industry: pre-consumer waste recovery and circular patterns. Environments (Basel, Switzerland), 12(3), 82. https://doi.org/10.3390/environments12030082.

Campos, E. A. R., Tavana, M., Schwengber ten Caten, C., Bouzon, M., & Carísio de Paula, I. (2021). A grey-DEMATEL approach for analyzing factors critical to the implementation of reverse logistics in the pharmaceutical care process. Environmental Science and Pollution Research International, 28(11), 14156-14176. https://doi.org/10.1007/s11356-020-11138-8. PMid:33206293.

Cowden, B., Karami, M., Tang, J., Ye, W., & Adomako, S. (2024). The spectrum of perceived uncertainty and entrepreneurial orientation: Impacts on effectuation. Journal of Small Business Management, 62(1), 381-414. https://doi.org/10.1080/00472778.2022.2051179.

Dalvi-Esfahani, M., Niknafs, A., Kuss, D. J., Nilashi, M., & Afrough, S. (2019). Social media addiction: Applying the DEMATEL approach. Telematics and Informatics, 43, 101250. https://doi.org/10.1016/j.tele.2019.101250.

Dalvi-Esfahani, M., Nilashi, M., Abumalloh, R. A., Thurasamy, R., & Ahmad, M. S. (2025). Investigating the interrelationships between the barriers of green computing adoption: TISM-MICMAC-DEMATEL method. Quality & Quantity, 59(Suppl. 1), 507-570. https://doi.org/10.1007/s11135-024-01977-9.

Darestani, S. A., Ganji, M., & Imannezhad, R. (2020). What are the key determinants of maintenance performance? Production, 30, e20190155. https://doi.org/10.1590/0103-6513.20190155.

Dinh Khoa, V., & Mai Anh, N. T. (2024). Examining the relationship between supply chain integration, innovation speed and supply chain performance under demand uncertainty. Engineering Management Journal, 36(1), 14-29. https://doi.org/10.1080/10429247.2023.2174766.

Eastwood, C., Klerkx, L., & Nettle, R. (2017). Dynamics and distribution of public and private research and extension roles for technological innovation and diffusion: case studies of the implementation and adaptation of precision farming technologies. Journal of Rural Studies, 49, 1-12. https://doi.org/10.1016/j.jrurstud.2016.11.008.

Eslami, M., & Melander, L. (2019). Exploring uncertainties in collaborative product development: Managing customer-supplier collaborations. Journal of Engineering and Technology Management, 53, 49-62. https://doi.org/10.1016/j.jengtecman.2019.05.003.

Ferguson, S., Brahma, A., Eckert, C., & Isaksson, O. (2024). Managing and modelling margins in design as a means for confronting the challenges of a disruptive world. Journal of Engineering Design, 35(10), 1185-1192. https://doi.org/10.1080/09544828.2024.2414130.

Ferreira, L. M. D., Moreira, A. C., & Silva, P. (2024). Lean implementation in product development processes: a framework proposal. Production Planning and Control, 35(15), 1927-1943. https://doi.org/10.1080/09537287.2023.2217429.

Hu, J., Liu, Z., & Shi, Y. (2025). An integrated process-oriented framework of low-carbon manufacturing networks: Evidence from multiple cases. Production Planning and Control, 37(4), 315-333. https://doi.org/10.1080/09537287.2025.2541329.

Huynh-Cam, T. T., Nalluri, V., Chen, L. S., White, J., Nguyen, T. H., Nguyen, V. C., & Lu, T. C. (2024). DT-fuzzy DEMATEL: a new method for determining important factors for student satisfaction with e-course adoption in a Vietnamese university. Journal of Applied Research in Higher Education, 18(1), 99-120. https://doi.org/10.1108/JARHE-04-2024-0173.

Jugend, D., & Silva, S. L. (2014). Product-portfolio management: a framework based on methods, organization, and strategy. Concurrent Engineering, 22(1), 17-28. http://dx.doi.org/10.1177/1063293X13508660.

Kao, P. J., Dacko, S., & Hu, Y. (2026). Unraveling the complexity of radical service innovation: a systematic review, integrative framework, and research roadmap. Journal of Business Research, 202, 115754. https://doi.org/10.1016/j.jbusres.2025.115754.

Kaufmann, C., & Kock, A. (2022). Does project management matter? The relationship between project management effort, complexity, and profitability. International Journal of Project Management, 40(6), 624-633. https://doi.org/10.1016/j.ijproman.2022.05.007.

Liew, C. F., Prakash, J., & Ong, K. S. (2024). Equipment cost efficiency: a comprehensive metric for evaluating operational and financial performance in manufacturing. Manufacturing Letters, 39, 16-19. https://doi.org/10.1016/j.mfglet.2023.12.002.

Marin, R. O., & Kaminski, P. C. (2020). Open innovation integration to product development: a sector level analysis within the manufacturing industry. Production, 30, e20200012. https://doi.org/10.1590/0103-6513.20200012.

Moerth-Teo, O., de Neufville, R., Suh, E. S., & Ramsauer, C. (2025). Practical incorporation of lifecycle flexibility into products at their early development stage. Research in Engineering Design, 36(3), 1-17. https://doi.org/10.1007/s00163-025-00448-y.

Nalluri, V., Chowdary, K. M., & Chen, L. S. (2025). Risk evaluation in the implementation of sustainable measures in the supply chain operations: a Fuzzy Delphi-DEMATEL approach. Cleaner Logistics and Supply Chain, 17, 100262. https://doi.org/10.1016/j.clscn.2025.100262.

Ortega, J. L., & Delgado-Quirós, L. (2024). The indexation of retracted literature in seven principal scholarly databases: a coverage comparison of dimensions, OpenAlex, PubMed, Scilit, Scopus, The Lens and Web of Science. Scientometrics, 129(7), 3769-3785. https://doi.org/10.1007/s11192-024-05034-y.

Ortiz-Barrios, M., Miranda-Dela Hoz, C., López-Meza, P., Petrillo, A., & De Felice, F. (2020). A case of food supply chain management with AHP, DEMATEL, and TOPSIS. Journal of Multi-Criteria Decision Analysis, 27(1-2), 104-128. https://doi.org/10.1002/mcda.1693.

Panarotto, M., & Alonso Fernández, I. (2024). Local absorption of uncertainty in complex systems using resilient objects. Journal of Engineering Design, 35(10), 1292-1310. https://doi.org/10.1080/09544828.2024.2327913.

Patel, S., Liu, Y., Siddique, Z., & Ghamarian, I. (2024). Metal additive manufacturing: Principles and applications. Journal of Manufacturing Processes, 131, 1179-1201. https://doi.org/10.1016/j.jmapro.2024.09.101.

Petronijevic, J., Etienne, A., & Siadat, A. (2022). Global risk assessment for development processes: from framework to simulation. International Journal of Production Research, 60(24), 7214-7238. https://doi.org/10.1080/00207543.2021.2023912.

Restrepo, J. A., Giraldo, E. A., & Vanegas, J. G. (2025). Measuring the production performance indicators for metal-mechanic industry: an LDA modeling approach. International Journal of Productivity and Performance Management, 74(1), 1-23. https://doi.org/10.1108/IJPPM-04-2023-0201.

Romeiro, E., Ferreira, C. V., & Cauchik, P. A. (2013). Projeto do produto. USA: Elsevier.

Saisridhar, P., Thuerer, M., & Avittathur, B. (2024). Assessing supply chain responsiveness, resilience and robustness (Triple-R) by computer simulation: A systematic review of the literature. International Journal of Production Research, 62(4), 1458-1488. https://doi.org/10.1080/00207543.2023.2180302.

Sallum, F. S. V., Gomes, L. F. A. M., & Machado, M. A. S. (2018). A dematel-topsis-wings approach to the classification of multimarket investment funds. Independent Journal of Management & Production, 9(4), 1203-1234. https://doi.org/10.14807/ijmp.v9i4.822.

Schmidt, F. C., Lopes, A. P. V. B. V., & Loures, E. R. (2023). A production system for the auto parts industry with elements of Industry 4.0. Production, 33, e20220005. https://doi.org/10.1590/0103-6513.20220005.

Shabani, R., Malvik, T. O., Johansen, A., & Torp, O. (2023). Dealing with uncertainties in the design phase of road projects. International Journal of Managing Projects in Business, 16(8), 27-57. https://doi.org/10.1108/IJMPB-02-2022-0050.

Stock, G. N., Tsai, J. C.-A., Jiang, J. J., & Klein, G. (2021). Coping with uncertainty: knowledge sharing in new product development projects. International Journal of Project Management, 39(1), 59-70. https://doi.org/10.1016/j.ijproman.2020.10.001.

Thakkar, J. J. (2021). Decision-Making Trial and Evaluation Laboratory (DEMATEL). In J. J. Thakkar. Multi-criteria decision making (Studies in Systems, Decision and Control, 336). USA: Springer. https://doi.org/10.1007/978-981-33-4745-8_9.

Varandas Junior, A., & Miguel, P. A. C. (2012). Análise do processo de preparação da produção no desenvolvimento de novos produtos por meio de um estudo de caso em uma empresa do setor siderúrgico. Production, 22(2), 185-200. https://doi.org/10.1590/S0103-65132012005000012.

Zhang, C., & Li, S. (2025). Different forms of supplier involvement, knowledge orchestration capability, technological uncertainty and new product development performance: a test of three-way interaction. European Journal of Innovation Management, 28(4), 1527-1554. https://doi.org/10.1108/EJIM-07-2023-0544.

Zhang, Z., & Min, M. (2024). Why project managers’ knowledge hiding is harmful to NPD projects: Resilient team resource caravans as an explanatory mechanism. International Journal of Operations & Production Management, 44(12), 2013-2035. https://doi.org/10.1108/IJOPM-01-2023-0018.

Zio, E. (2025). Advances in reliability analysis and risk assessment for enhanced safety. Journal of Reliability Science and Engineering, 1(1), 013002. https://doi.org/10.1088/3050-2454/adbc65.
 


Submitted date:
01/06/2026

Accepted date:
04/16/2026

6a4bcae4a9539544417e61b3 production Articles
Links & Downloads

Production

Share this page
Page Sections